Design Services were requested for the proposed additional roads within the new entry and circulation road for the nine pearls residential complex. In addition, some locations along Mesaimeer Road (P008 C3) required traffic survey using Turning Movement Counts (TMC).

The Peri Tower (scaffolding is used to support the construction process of a bridge as part of the proposed construction and upgrading of Mesaimeer Road Project (P008 C3), As per the proposed structural protection system of the existing shaft, the legs of the Peri Tower (scaffolding) to be supported by RC foundations.

Scope:

SEERO provided the design services related to the nine pearls residential complex through 4 main stages as follows:

  1. Geometric design of the entrance and circulation roads
  2. Pavement Design
  3. Stormwater drainage design
  4. Proposing the protection of existing utilities based on authorities standard details

In addition, the following deliverables were submitted for the required traffic count locations that included:

  1. The Data of Turning Movement Counts (TMCs).
    • Traffic Survey raw and processed data files.
  2. Traffic Survey Report
    • Traffic Survey Report will include description of the site conditions for each survey location, junction and lane configuration summary of the survey results in addition to data consistency check.

Seero also verified the structural integrity of the existing shaft (ASO 31) whish clash underneath the 9B peri tower foundation at Mesaimeer road. Seero delivered a structural design verification report.SEERO

Client

PWA - Ashghal

Contractor

Consolidated Contractor Group (CCC)

Location

Doha, Qatar

Services

Consultancy Works