a blue and white logo with the word seero on it.

Luhwailah Link Road

Description:

Luhwailah link road is a 12 km long road and it’s part of the expressway program in Public Works Authority (PWA- Ashghal) projects. The project is in the North of Qatar, starting from exit no. 66 and extends towards the sea.

Scope:

Seero has conducted a Swale Ditch Assessment study for the project. The assessment was for the current condition of the as-built swale ditch system. It also consisted of a Value Engineering study (VE) and several assessment as listed below:

  • Design Basis
  • Assessment Methodology
  • Slope Stability Analysis
  • Flooding Test
  • Value
  • Geotechnical Investigations
  • Catchment Analysis
  • Rectification Method of Damaged Geotextile/Interrupted Soil of Swale Ditch

Client

PWA - Ashghal

cONTRACTOR

Bin Omran Trading & Contracting L.L.C

Location

Al Huwailah, Qatar.

Services

Stormwater & Drainage System Design